Station

Data Availability

Data Type

WRTDS: Monitored load - computed using the USGS WRTDS flow-normalization method (source).

CAST: Expected load in the long term - computed using the time-averaged version of the Chesapeake Bay Program Phase 6 Watershed Model (source).

CAST_DM: Expected load with lags - computed using the dynamic version of the Chesapeake Bay Program Phase 6 Watershed Model (source).

Methodology

The TMDL indicator framework (source).

Webinar

A webinar on the TMDL indicator and the METRIC tool (source).

Contact

Qian Zhang (UMCES @ CBPO).

Contributors

Qian Zhang (UMCES @ CBPO), Gopal Bhatt (PSU @ CBPO), Isabella Bertani (UMCES @ CBPO), and others.

Version

Last updated on May 24, 2024.

Interactive Plot

(Note: To obtain values in million pounds (Mlbs), refer to the Data Table below.)

Data Type

WRTDS: Monitored load - computed using the USGS WRTDS flow-normalization method (source).

CAST: Expected load in the long term - computed using the Chesapeake Bay Program Watershed Model (source).

CAST_DM: Expected load with lags - computed using the Chesapeake Bay Program Watershed Model (source).

Data Table

Interactive Plot

Data Type

CAST: Expected load in the long term - computed using the Chesapeake Bay Program Watershed Model (source).

Data Table

Interactive Plot

(Note 1: Negative values indicate load reductions; positive values indicate load increases.)

(Note 2: To obtain values in million pounds (Mlbs), multiply the percent change shown in this plot by the CAST load in the first year of the assessment period, which is available in the Data Table under the About tab.)

Data Type

WRTDS: Monitored load - computed using the USGS WRTDS flow-normalization method (source).

CAST: Expected load in the long term - computed using the Chesapeake Bay Program Watershed Model (source).

CAST_DM: Expected load with lags - computed using the Chesapeake Bay Program Watershed Model (source).

Interpretive Text